PROJECT DATA

CLIENT: BALLINGER STORAGE PARTNERS, LLC

DEVELOPER: CASCADE INVESTMENT PROPERTIES

ARCHITECT: JACKSON | MAIN

LANDSCAPE: RICHARD WARD ASSOCIATE

CIVIL: NAVIX ENG.

STRUCTURAL: VISSER ENG.

MPE: PRESSLER ENG.

GENERAL CONTRACTOR: JPR CONSTRUCTIONS

COMPLETION: 2020

SITE AREA: 33,806 SF

BUILDING AREA: 107,000 SF

NUMBER OF STORIES: 2 STORIES (1A) + 3 STORIES (2B)

BUILDING USE: SELF-STORAGE (S-1)

CONSTRUCTION COST: UNDER $3 MILLION

SUSTAINABILITY FEATURES AND METRICS

PARTNERS - Consultants who identify energy-efficient mechanical units, lighting strategies, and low-water plants. LEED was a city requirement.


ENERGY CONSUMPTION - Total energy cost savings: 68.7%


AIR QUALITY - High filtration of outside air and an engineered air distribution system for the best indoor air quality in the storage areas.


SOLAR ACCESS - 86% quality view from regularly occupied area (office)


THERMAL/EVELOPE/AIR - Optimized thermal comfort - at 70-75°F and 50% humidity.


MATERIALS - 94.52% recycling rate of all construction waste.


WATER USAGE - Water-efficient bathroom fixtures, plants with low water requirements, and NO turf grass resulted in 82% reduction in water usage.


LIGHTING - Project includes 100% LED lights and office lights have dimming controls. No mercury lamps were used, and the average picograms per lumen-hour is zero.


MECHANICAL - High-efficiency natural gas heating and ventilation units.