PROJECT DATA

CLIENT: PSI ATLANTIC MAPLE VALLEY WA #2

ARCHITECT: JACKSON | MAIN

LANDSCAPE: BARGHAUSEN CONSULTING ENG.

CIVIL: BARGHAUSEN CONSULTING ENG.

STRUCTURAL: HWE ENGINEERING

MPE: BERONA ENGINEERS & AWA ELECTRICAL

GENERAL CONTRACTOR: COLVOS CONSTRUCTION

COMPLETION: 2026

SITE AREA: 78,411 SF

BUILDING AREA: 99,391 SF

NUMBER OF STORIES: 3 STORIES

BUILDING USE: SELF-STORAGE

CONSTRUCTION COST: $9 MILLION

SUSTAINABILITY FEATURES AND METRICS

PASSIVE STRATEGIES - The project was previously developed and part of a three phase plan in Maple Valley, WA


PARTNERS - The project partnered with BEE, AWA Electrical & Berona Engineers to ensure design measures were implemented.


ENERGY - The predicted annual energy cost is 26% less than average new storage buildings, according to ASHRAE 90.1


BIODIVERSITY - More than 90% of material waste was diverted from landfills. This includes salvage, recycling, and upcycling.


SOLAR ACCESS - The project was able to secure four credits by installing about 46 kWh solar array. This will offset energy costs.


THERMAL/EVELOPE/AIR - The building tested with an average air leakage of 0.149 cfm/sf, 12% better than WSEC’s maximum rate.


SITE WATER - The project reduced outdoor water use by 64% by using native, drought-tolerant plants.


WATER USAGE - By utilizing low-flow fixtures, the facility is estimated to use 49.88% less indoor water than baseline buildings.


LIGHTING - The project specified all LED light fixtures to reduce energy consumption.


MECHANICAL - Through commissioning efforts, the design team field-verified the performance of all HVAC units during construction.