CASE STUDy - 212th business park | kent, wa | 2022

PROJECT DATA

CLIENT: PS BUSINESS PARKS

ARCHITECT: JACKSON | MAIN

LANDSCAPE: BETHUNE ASSOCIATES INC.

CIVIL: BARGHAUSEN CONSULTING ENG.

STRUCTURAL: SHUTLER CONSULTING ENG.

MPE: T.E. INC.

GENERAL CONTRACTOR: GOUDY CONSTRUCTION LLC.

ENVIRONMENTAL ENGINEER: GLUMAC

COMPLETION: 2022

SITE AREA: 1,222,719 SF

BUILDING AREA: 81,041 SF

NUMBER OF STORIES: 1 STORY

BUILDING USE: SELF-STORAGE (S-1), UTILITY (U)

CONSTRUCTION COST: $13.9 MILLION

SUSTAINABILITY FEATURES AND METRICS

PASSIVE STRATEGIES - The project, a redevelopment of a parking lot within an existing business park, is well situated along the interstate corridor, reducing the carbon footprint of transporting goods and materials.


SHADING - Shading devices at regularly occupied areas.


SUSTAINABLE MATERIALS - Design and construction teams verified that at least 25 permanently installed products met Environmental Declarations and 24.5% met responsible extraction criteria.

PARTNERS - The project partnered with Glumac and FSi Engineers to coordinate and ensure design measures were implemented.


ENERGY CONSUMPTION - The total predicted annual energy consumption is 28.5% less than that of average new storage buildings.



AIR QUALITY - The project was designed to have increased ventilation in the office areas, and over 95% of Paints, Flooring, Composite Woods, and Insulation were VOC-free.

BIODIVERSITY - More than 99% of material waste was diverted from landfills, including material salvage, recycling, and upcycling.



SITE WATER - The site design reduced irrigation needs by 80%


WATER USAGE - The building meters all hot water usage and reduces domestic water consumption by 31% compared to the average warehouse building.


MATERIALS - The design and construction teams verified that at least 18 permanently installed products met the requirements for material ingredient reporting.


LIGHTING - The project specified light fixtures that achieved the required BUG ratings to reduce light pollution.


MECHANICAL - Through commissioning efforts, the design team field-verified the performance of all HVAC units during construction.